|
|
Installation of 300 MHz Bruker DPX System
Aluminum coated Mylar, "super insulation" is prepared as final insulating layer above the base plate.
The base plate and O-ring are bolted to the upper assembly. A vacuum pump is attached for initial roughing. A nitrogen purge line is attached to enable purging of the dewar. After rough pumping, a turbo pump and leak detector are installed on the vacuum line and the system in pumped overnight.
|
|